Cameroon Civil
Aviation Authority

Aeronautical operations

Organisation of Cameroon’s airspace

The organisation of Cameroon’s airspace aims to meet several objectives:

  • Air traffic safety;
  • Regulation of traffic flow;
  • Adapting regulations to traffic density and type;
  • Flexible use of airspace

 

Structure of Cameroon’s Airspace

Airspace

Responsible ATS centres

Flight Information Region (FIR)

Brazzaville ACC and N’Djamena
ACC (Area Control Centre)

Upper Information Region (UIR)



Brazzaville RCC and N’Djamena
 (RCC)

Upper Terminal Area – UTA

 

Douala Regional Control Centre (RCC)

Terminal Area – TMA

–   RCC and Douala Approach

–   Yaounde – Nsimalen Approach

–    Garoua Approach

–    Maroua-Salak Tower

–   N’Gaoundere Tower

Control Traffic Region – CTR

–    Douala Tower

–   Yaounde – Nsimalen Tower

–   Garoua Tower

–    Maroua-Salak Tower

–   N’Gaoundere Tower



Areas with special status

Description

Identification 

PROHIBITED AREAS

–   FKP 1 – KOUTABA DROTZ (FOUMBAN)

–   FKP 2 – MBANDJOK

–   FKP 3 – N’GAOUNDERE FALAISE

–   FKP 5 – CAP LIMBOH

–   FKP 6 – YAOUNDE

–   FKP 7 – BAKASSI

–   FKP 8 – MIKE

DANGER AREAS

–       FKD 4KRIBI

 RESTRICTED AREAS

–       FKR 09 – YAOUNDE SOUTH ZONE

–       FKR 10 – YAOUNDE NORTH ZONE

–   FKR 11 – GAROUA

–       FKR 12 – GAROUA

OTHERS

–       DOUALA DRAINAGE AREA

–       GAROUA DRAINAGE AREA

–       YAOUNDE/N’SIMALEN DRAINAGE AREA

Exploitation aéronautique

Organisation of Cameroon’s airspace

The organisation of Cameroon’s airspace aims to meet several objectives:

  • Air traffic safety;
  • Regulation of traffic flow;
  • Adapting regulations to traffic density and type;
  • Flexible use of airspace

 

Structure of Cameroon’s Airspace

Airspace

Responsible ATS centres

Flight Information Region (FIR)

Brazzaville ACC and N’Djamena
ACC (Area Control Centre)

Upper Information Region (UIR)



Brazzaville RCC and N’Djamena
 (RCC)

Upper Terminal Area – UTA

 

Douala Regional Control Centre (RCC)

Terminal Area – TMA

–   RCC and Douala Approach

–   Yaounde – Nsimalen Approach

–    Garoua Approach

–    Maroua-Salak Tower

–   N’Gaoundere Tower

Control Traffic Region – CTR

–    Douala Tower

–   Yaounde – Nsimalen Tower

–   Garoua Tower

–    Maroua-Salak Tower

–   N’Gaoundere Tower



Areas with special status

Description

Identification 

PROHIBITED AREAS

–   FKP 1 – KOUTABA DROTZ (FOUMBAN)

–   FKP 2 – MBANDJOK

–   FKP 3 – N’GAOUNDERE FALAISE

–   FKP 5 – CAP LIMBOH

–   FKP 6 – YAOUNDE

–   FKP 7 – BAKASSI

–   FKP 8 – MIKE

DANGER AREAS

–       FKD 4KRIBI

 RESTRICTED AREAS

–       FKR 09 – YAOUNDE SOUTH ZONE

–       FKR 10 – YAOUNDE NORTH ZONE

–   FKR 11 – GAROUA

–       FKR 12 – GAROUA

OTHERS

–       DOUALA DRAINAGE AREA

–       GAROUA DRAINAGE AREA

–       YAOUNDE/N’SIMALEN DRAINAGE AREA